Page 342 - C++
        P. 342
     (i)     Suggest the most suitable location to install the main server
                           of this institution to get efficient connectivity.                      1
                   (ii)    Suggest  the  best  cable  layout  for  effective  network
                           connectivity of the building having server with all the other
                           buildings.                                                              1
                   (iii)   Suggest the devices to be installed in each of these buildings
                           for connecting computers installed within the building out of
                           the following :                                                         1
                               Gateway
                               Modem
                               Switch
                   (iv)    Suggest  the  topology  of  the  network  and  network  cable  for
                           efficiently connecting each computer installed in each of the
                           buildings out of the following :                                        1
                           Topologies : Bus Topology, Star Topology
                           Network Cable : Single Pair Telephone Cable, Coaxial Cable,
                           Ethernet Cable
                                                                                               00
      91                                            23                                        P.T.O.
     	
